CRANKSHAFT POLISHING

Air distributor was repaired.

Starting valves were inspected also

Gear of crankshaft (flywheel side) was worn and we recommend to be replaced. 

Piston grooves No.1 & No.6  were inspected and found acceptable.

Connecting rod big end bearings No.1 & No.6 were inspected and found acceptable.

Piston pins and bush clearance No.1 & No.6 were inspected and found acceptable.

Liners No.1 & No.6 were inspected and Honing was carried out. 

Timing was carried out properly.

Thorough cleaning of sump tank carried out and all outfitting installation carried out. 

Lub Oil filters were cleaned prior to running test.

Test was carried out with 450KW load with satisfactory results.